Town Projects
Capital Projects Planned for 2014


Engineering Department

  • I-25/SH 392 Interchange – enhancements ($22,000)
  • Street Maintenance – overlay ($1,069,500)
  • Street Maintenance – crack seal, chip seal, and concrete replacement ($337,500)
  • Bridge replacement – WCR 21 at Greeley No. 2 Canal 2012-2014 project, ($109,270 + $425,000 grant)
  • WCR 19 Right turn lane to Hwy 392 ($150,000)
  • Eastman Pk / Cornerstone Roundabout – construct ($621,500)
  • County Line Road ditch erosion mitigation ($50,000)
  • Replace railing on 7th Street  / Poudre River Bridge ($33,000)
  • 7th Street sidewalk crossing at railroad ($20,000)
  • Poudre River dredging at WCR 13 ($50,000)
  • Town-owned facility parking lot maintenance ($14,000)
  • Kyger Non-Potable Water Reservoir (Total: $5,700,000 w/ CWCB Loan for $4.5 million)
  • Three million gallon water tank ($700,000 + $450,000 grant)
  • Northern Integrated Supply Project (NISP) ($83,000)
  • Sewer – Replace Force Main to Gravity Sewer ($190,000 + $190,000 grant pending)
  • Storm Drainage – Law Basin Master Plan Channel, 2013-2015 project ($278,243 + $626,716 FEMA grant)
  • Storm Drainage – Law Basin West Tributary Channel, 2013-2015 project ($989,272)


Parks, Recreation & Culture Department

  • Fossil Belmont Ridge Park development design ($40,000)
  • Windsor Trail – trail parallel to South 7th Street ($99,450 + $120,346 grant); Windsor West Connection planning ($50,000); BROE easement acquisition ($5,000)
  • Poudre Trail – extension from Westwood Village ($250,000); extension in Three Bells I conservation easement share with Larimer County ($25,000)
  • Chimney Park Pool – Deck Resurfacing ($232,350)
  • Cemetery – Irrigation design and engineering ($329,547)
  • Town of Windsor Museum – Interpretive Landscaping ($58,138); Eaton House Historic Structure Assessment Master Plan and Renovation ($15,000)
  • Windsor West Park – replace irrigation system ($120,000)
  • ADA Tittle II Compliance – various projects ($70,955)
  • Construction of pipe encasement through Universal Forest Products ($195,000)
  • Covenant Park – install pump ($49,000)
  • Poudre Plan corrections and Town Hall connection to Main Park ($30,000)


Public Works Department

  • Railroad Crossing improvements – 15th Street and CR 72 ($30,000)
  • Facilities – Cooling tower for Town Hall ($80,000); Sand and restripe floor at CRC ($30,000)
  • Waterline – Replacement on Woodbine, Sunflower and Snapdragon Drives ($400,000)
  • Sewer Line – Rehab ($82,875)
  • Manhole Rehab ($32,000)
  • Sewer Nutrient Study ($14,400 + $57,600 grant)
  • Fleet Vehicles, New, Replacement, Lease Exchange ($690,050)
  • LED Streets Lighting Pilot Project (in partnership with Poudre Valley REA)


Information Technology Division

  • Financial Management Software Upgrade ($280,000)
  • Development Management System Software ($210,000)
  • Unified Communications Upgrade ($91,000)


What is the status of current projects?
The Capital Projects Status is updated monthly with progress of the project as well as expenditures.  This page is also linked from the Town Manager's Quick Links on the right side.

Where do I find available bids or RFP's?

Find available bids in the the Bids and RFP's page listed in the left menu of the home page or under Services on the main menu.

Notify Me of new bid postings!
You may also subscribe to be notified of new bid postings, as well as through the Bids and RFP page.